1. IQC Inspection;
All raw materials have to pass our inspection before keep them in stock.
![](/userfiles/1378346776.jpg)
2. Materials Preparation;
Prepare raw materials of an order, including cells, PCM, connectors, PVC tube, labels and other small materials.
![](/userfiles/1378346799.jpg)
3. Cell Voltage & Resistance Checking;
To make sure all cells we use in the same order have good uniformity.
![](/userfiles/1378346917.jpg)
4. Cell Configuration & Gluing;
![](/userfiles/1378346943.jpg)
5. Protection Circuit Module Soldering;
![](/userfiles/1378346964.jpg)
6. Connectors and wires Soldering;
![](/userfiles/1378346990.jpg)
7. Nickel Tabs Spot Welding;
![](/userfiles/1378347014.jpg)
8. Connectors and wires Soldering;
![](/userfiles/1378347034.jpg)
9. Under Assembly Function Inspection;
![](/userfiles/1378347088.jpg)
10. PVC Shrinking;
![](/userfiles/1378347128.jpg)
11. Pack Function Inspection;
![](/userfiles/1378347150.jpg)
12. Aging and cycling;
The test of capacity.
![](/userfiles/1378347190.jpg)
13. Appearance & Dimension Inspection;
![](/userfiles/1378347217.jpg)
14. Labeling & Packing Area;
![](/userfiles/1378347402.jpg)
Note: All pictures, work and content of this post is Copyright. No plagiarize and copy is allowed.
![](/userfiles/1378346213.jpg)
![](/userfiles/1380331016.jpg)
Are you wonder how we make a battery/pack?
Yes?! OK, let's go!
Note: All pictures, work and content of this post is Copyright. No plagiarize and copy is allowed.
1. IQC Inspection;
All raw materials have to pass our inspection before keep them in stock.
![](/userfiles/1378346776.jpg)
2. Materials Preparation;
Prepare raw materials of an order, including cells, PCM, connectors, PVC tube, labels and other small materials.
![](/userfiles/1378346799.jpg)
3. Cell Voltage & Resistance Checking;
To make sure all cells we use in the same order have good uniformity.
![](/userfiles/1378346917.jpg)
4. Cell Configuration & Gluing;
![](/userfiles/1378346943.jpg)
5. Protection Circuit Module Soldering;
![](/userfiles/1378346964.jpg)
6. Connectors and wires Soldering;
![](/userfiles/1378346990.jpg)
7. Nickel Tabs Spot Welding;
![](/userfiles/1378347014.jpg)
8. Connectors and wires Soldering;
![](/userfiles/1378347034.jpg)
9. Under Assembly Function Inspection;
![](/userfiles/1378347088.jpg)
10. PVC Shrinking;
![](/userfiles/1378347128.jpg)
11. Pack Function Inspection;
![](/userfiles/1378347150.jpg)
12. Aging and cycling;
The test of capacity.
![](/userfiles/1378347190.jpg)
13. Appearance & Dimension Inspection;
![](/userfiles/1378347217.jpg)
14. Labeling & Packing Area;
![](/userfiles/1378347402.jpg)